{"id":202,"date":"2024-07-10T08:23:48","date_gmt":"2024-07-10T08:23:48","guid":{"rendered":"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/?page_id=202"},"modified":"2024-07-29T18:42:38","modified_gmt":"2024-07-29T18:42:38","slug":"the-project","status":"publish","type":"page","link":"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/the-project\/","title":{"rendered":"The Project"},"content":{"rendered":"\n<div id=\"proj1\" class=\"wp-block-group backgroundImage has-global-padding is-layout-constrained wp-container-core-group-is-layout-6b3b7742 wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<div class=\"wp-block-group notchContainer has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"bandL wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image size-full notchBottom\"><img loading=\"lazy\" decoding=\"async\" width=\"174\" height=\"66\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/white-negative-notch.png\" alt=\"\" class=\"wp-image-702\"\/><\/figure>\n\n\n\n<p class=\"bandR wp-block-paragraph\"><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">The Project<\/h2>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Starlight (UK) Limited is proposing to develop a new Energy Hub, near Blyth in Nottinghamshire, to help the UK meet its Net Zero targets.<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The proposals include the deployment of solar panel arrays, along with battery energy storage facilities, which will generate 200GWh annually of electricity back in to the National Grid, via a new substation, which will connect to the existing overhead National Grid pylon line.<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The proposed development areas are to the west and east of Blyth, as well as to the east of Ranskill.<\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<iframe src=https:\/\/nextenergy.maps.arcgis.com\/apps\/instant\/exhibit\/index.html?appid=e2e2f7388a3f44d9ac7b081518a9fc28 width=\"100%\" height=\"700\" frameborder=\"0\" style=\"border:0\" allowfullscreen>iFrames are not supported on this page.<\/iframe>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Community Consultation Events<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">While Starlight are committed to this development proposal, they intend on holding a series of Community Consultation Events in order to present their proposals to the local communities and will seek feedback from these communities with regards to the development plans and Starlight\u2019s biodiversity enhancement and landscape impact mitigation proposals, before any formal deployment consent is sought via an associated Development Consent Order (DCO) application.<\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div id=\"input\" class=\"wp-block-group has-global-padding is-layout-constrained wp-container-core-group-is-layout-6b3b7742 wp-block-group-is-layout-constrained\">\n<figure class=\"wp-block-image size-full notch\"><img loading=\"lazy\" decoding=\"async\" width=\"174\" height=\"66\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/white-notch.png\" alt=\"\" class=\"wp-image-612\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Your input is invaluable<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"276\" height=\"276\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Input-white-icon.png\" alt=\"\" class=\"wp-image-472\" style=\"width:150px\" srcset=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Input-white-icon.png 276w, http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Input-white-icon-150x150.png 150w\" sizes=\"auto, (max-width: 276px) 100vw, 276px\" \/><\/figure>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer hideMobile\"><\/div>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"556\" height=\"10\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Yellow-rounded-line.png\" alt=\"\" class=\"wp-image-161\" style=\"width:300px\" srcset=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Yellow-rounded-line.png 556w, http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Yellow-rounded-line-300x5.png 300w\" sizes=\"auto, (max-width: 556px) 100vw, 556px\" \/><\/figure>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">While Starlight is dedicated to the development proposal, they are also committed to community&nbsp;engagement. The team will hold a series of&nbsp;<strong>Community Consultation Events.<\/strong>&nbsp;These events will&nbsp;present our proposals to the local communities and offer a platform for feedback on our development&nbsp;plans, including our initiatives for biodiversity enhancement and landscape impact mitigation. Your input is invaluable, and we look forward to incorporating it before proceeding with a Development Consent Order (DCO) application.<\/p>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">In accordance with your feedback<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">This page will be kept up to date with details of the proposals, and further information will be published here in advance of any DCO application being submitted.<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Starlight is committed to the transition to a net-zero future, reducing the impacts of climate change both locally and globally. Recent analysis on electricity generation costs published by Department for Business, Energy &amp; Industrial&nbsp;Strategy has indicated that large-scale solar PV will be the&nbsp;cheapest electricity generating technology&nbsp;available in the next few years.<\/p>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"546\" height=\"546\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Large-scale-solar.png\" alt=\"\" class=\"wp-image-414\" style=\"width:300px\" srcset=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Large-scale-solar.png 546w, http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Large-scale-solar-300x300.png 300w, http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Large-scale-solar-150x150.png 150w\" sizes=\"auto, (max-width: 546px) 100vw, 546px\" \/><\/figure>\n\n\n\n<div style=\"height:5px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized yellowLine\"><img loading=\"lazy\" decoding=\"async\" width=\"556\" height=\"10\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Yellow-rounded-line.png\" alt=\"\" class=\"wp-image-161\" style=\"width:300px\" srcset=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Yellow-rounded-line.png 556w, http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Yellow-rounded-line-300x5.png 300w\" sizes=\"auto, (max-width: 556px) 100vw, 556px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\" id=\"projectP\">Large scale solar farms <br>generate the cheapest <br>electricity available<\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Promoting local engagement<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">As part of their socially responsible approach to supporting the UK\u2019s NetZero strategy, Starlight is committed to&nbsp;ensuring that, wherever possible, local contractors are used in all aspects of their development\u2019s deployment. The&nbsp;major opportunities arise during the construction phase when suitably qualified local firms will be invited to bid for different aspects of construction. Starlight encourage their contractors to source as much construction material locally as possible (i.e. within the county), and to use local transport and plant hire companies where possible, in addition to local services and amenities.<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Starlight\u2018s development brings a range of local benefits with it and during the consultation process these will be&nbsp;explained in more detail.<\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div id=\"proposed\" class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<figure class=\"wp-block-image size-full notch\"><img loading=\"lazy\" decoding=\"async\" width=\"174\" height=\"66\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/white-notch.png\" alt=\"\" class=\"wp-image-612\"\/><\/figure>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Proposed Community Engagement Events<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Blyth \u2013 tbc<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Ranskill \u2013 tbc<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div id=\"proj3\" class=\"wp-block-group backgroundImage has-global-padding is-layout-constrained wp-container-core-group-is-layout-6b3b7742 wp-block-group-is-layout-constrained\">\n<figure class=\"wp-block-image size-full notch\"><img loading=\"lazy\" decoding=\"async\" width=\"174\" height=\"66\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/light-blue-notch.png\" alt=\"\" class=\"wp-image-629\"\/><\/figure>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">A Nationally Significant Infrastructure Project<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The Jubilee Energy Hub is a Nationally Significant Infrastructure Project (NSIP) because of its scale and generation capacity.<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">This means that an application will be submitted to the Secretary of State for Energy Security and Net Zero for a Development Consent Order. This is similar to a planning permission and grants development consent for projects of this nature. The application will follow a defined process which assesses potential environmental impacts and the process is managed by the Planning Inspectorate (PINS) on behalf of the Secretary of State.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-text-align-center borderLink wp-block-paragraph\"><a href=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/project-proposal\/\" data-type=\"page\" data-id=\"21\">FIND OUT MORE ABOUT THE PROJECT PROPOSAL<\/a><\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div id=\"download\" class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<figure class=\"wp-block-image size-full notch\"><img loading=\"lazy\" decoding=\"async\" width=\"174\" height=\"66\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/white-notch.png\" alt=\"\" class=\"wp-image-612\"\/><\/figure>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-fbf9b8ba wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"40\" height=\"20\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Menu-dropdown.png\" alt=\"\" class=\"wp-image-226\"\/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><a href=\"#\">Download general information about the proposed scheme<\/a><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"40\" height=\"20\" src=\"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-content\/uploads\/2024\/07\/Menu-dropdown.png\" alt=\"\" class=\"wp-image-226\"\/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><a href=\"#\">Download a feedback form about the proposed energy hub scheme<\/a><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Project Starlight (UK) Limited is proposing to develop a new Energy Hub, near Blyth in Nottinghamshire, to help the UK meet its Net Zero targets. The proposals include the deployment of solar panel arrays, along with battery energy storage facilities, which will generate 200GWh annually of electricity back in to the National Grid, via [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-202","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-json\/wp\/v2\/pages\/202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-json\/wp\/v2\/comments?post=202"}],"version-history":[{"count":64,"href":"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-json\/wp\/v2\/pages\/202\/revisions"}],"predecessor-version":[{"id":821,"href":"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-json\/wp\/v2\/pages\/202\/revisions\/821"}],"wp:attachment":[{"href":"http:\/\/www.topographicwebdesign.co.uk\/jubilee\/wp-json\/wp\/v2\/media?parent=202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}